Primary users
CEA project developers, project sponsors, owner’s representatives, and technical or commercial review teams.
CEA PROJECT DECISION SUPPORT
The Crop Urbanis Platform is a controlled-environment agriculture project decision-support system in development for vertical farms and hydroponic greenhouses. It links project requirements, supplier claims, assumptions, calculations and professional reviews so that alternatives can be compared before configuration, procurement and delivery commitments are made.
Current stage: internal MVP · selected organisational validation and private-beta scopes by agreement
The internal MVP is being developed around project definition, supplier comparison, scenario review and decision recording. Public self-service is not available.
INITIAL USE
CEA project decisions draw on crop targets, facility and utility constraints, supplier proposals, operating assumptions, budgets and delivery dependencies. The Platform brings that reasoning into one project record without treating every source or number as equally reliable.
CEA project developers, project sponsors, owner’s representatives, and technical or commercial review teams.
Project definition, concept and feasibility review, configuration comparison, supplier selection, and review of material changes.
A source-linked record of what is known, declared, calculated, assumed, unresolved and approved.
CORE WORKFLOW
The Platform organises the reasoning behind a project decision. Each step preserves the source, status, assumptions, review history and downstream use of material information.
Record the project objective, site, intended market, crop and production targets, facility and utility constraints, budget, schedule, decision owners and unresolved questions.
Bring permitted project and supplier material into the workspace while retaining the original document, source location, wording, version and access conditions.
Connect claims to project requirements; normalise units and terminology; identify missing operating conditions; and make alternative configurations comparable.
Apply versioned physical, production, utility and financial calculations to explicit assumptions and ranges. Each design case records its model version and validity conditions.
Show which inputs are verified, estimated, disputed or unknown; identify sensitivity drivers; and record which conclusions depend on them.
Store the selected alternative, rationale, reviewers, unresolved conditions and affected downstream requirements for procurement, delivery, commissioning or handover.
PLATFORM CAPABILITIES
The internal MVP is organised around four connected capability groups. Availability in any organisational beta depends on the project objective, permitted data and named review roles.
Structure project context, requirements, constraints, responsibilities, evidence gaps and validation questions.
Output: project baseline and requirement register.
Retain supplier claims with their sources and operating conditions; normalise comparable values; and identify omissions, exclusions and requirement conflicts.
Output: comparison matrix and clarification log.
Compare physical, production, utility and financial design cases through explicit assumptions, ranges, model versions and sensitivity analysis.
Output: scenario summary and decision-readiness record.
Record reviews, approvals, rationale, dependencies and changes; identify affected work when an input changes; and carry accepted information into downstream project requirements.
Output: decision record and implementation or handover inputs.
EVIDENCE AND UNCERTAINTY
The project record is being designed to preserve the origin, status and review history of material values. Correct extraction does not turn a supplier statement, literature value or expert estimate into a measured project fact.
Evidence status and review status remain separate. A value may be extracted with high confidence and still require supplier confirmation or professional validation.
CHANGE IMPACT
CEA decisions are interdependent. A change in crop mix, target daily light integral, utility availability, supplier capacity, schedule or energy price may affect equipment requirements, heat and moisture loads, production assumptions, CAPEX/OPEX and earlier approvals.
The project model is being developed to record these dependencies and identify the comparisons, calculations, decisions and downstream requirements that may need review.
Illustrative dependency
The Platform identifies work that may require review; it does not decide whether the changed configuration is technically or commercially acceptable.
ILLUSTRATIVE WORKFLOW
A project team receives three proposals for lighting, HVAC and irrigation packages. The documents use different units, scope boundaries and operating conditions. Some values are directly comparable; others are incomplete, conditional or based on different project assumptions.
A project team receives three proposals for lighting, HVAC and irrigation packages. The documents use different units, scope boundaries and operating conditions. Some values are directly comparable; others are incomplete, conditional or based on different project assumptions.
The Platform keeps each source claim, maps it to the same project requirements, flags missing conditions and candidate conflicts, and compares agreed design cases under one explicit set of assumptions.
Normalised project comparison
Reviewers can then see:
Illustrative workflow only; not a customer case study or performance claim.
DIVISION OF RESPONSIBILITY
The Platform separates document assistance, reproducible computation, uncertainty handling and professional responsibility.
Extracts candidate claims from permitted documents, maps terminology, retrieves approved references and flags possible omissions, inconsistencies or requirement conflicts. AI outputs remain linked to sources and subject to review.
Apply unit conversions, completeness and compatibility checks, capacity calculations and versioned scenario models. The same approved inputs and model version produce the same result.
Distinguishes fixed values, estimates, ranges, disputed inputs and unknowns; shows sensitivity; and avoids presenting uncertain biological or commercial inputs as confirmed facts.
Agronomists, engineers, suppliers, project owners and commercial reviewers confirm inputs and approve consequential decisions within their own scope.
CURRENT PRODUCT BOUNDARY
The current product focus is project definition, evidence comparison, design-case review and decision recording. It is not presented as an operating greenhouse platform.
A later operating-data layer may compare approved project assumptions with measured performance under separately governed data, integration and review conditions.
Selected organisations may be considered for an agreed scope covering project purpose, permitted data, authorised users, capability groups, review roles, evaluation criteria, support, export and retention. Public forms accept high-level context only.
PRODUCT STATUS
The following resources separate product scope, technical implementation and data responsibilities.
Current development stage, organisational beta conditions, capability status and roadmap.
Project data flow, AI role, calculation services, model governance, review controls and evaluation approach.
Public-form boundary, private-beta access, permitted data, organisational roles and data-handling principles.
A concise downloadable summary of the problem, workflow, product status and intended use.
Share high-level organisational context, the project stage, the decision to be supported, relevant data categories and the responsible reviewers. Confidential project or supplier files should not be submitted through the public form.